Kerenzerberg Road Tunnel safety gallery

03.06.2022
Glarus

Day’s programme

Visiting the installation sites, the TBM tunnelling for the new safety gallery as well as the crossover area of the tunnel boring machine and existing ventilation tunnel. After the project presentation we will travel by bus from the information pavilion to the portal. From there you will take a construction site vehicle to the Hofwald crossover area in the middle of the road tunnel and also see the tunnelling made by the tunnel boring machine. At a length of 5.7 kilometres, the Kerenzerberg Tunnel is the fifth longest road tunnel in Switzerland. The overall renovation project comprises two main measures: the construction of a new safety gallery and the subsequent repair of the existing road tunnel.

 

Timetable

07.40

Meeting at the Inseli car park (behind KKL Lucerne)

07.45

Departure in Lucerne (bus)

09.00

Arrival at the Kerenzerberg Tunnel construction site

- Coffee and croissants in the information pavilion

- Project introduction / current state of work

- Site visit in 2 groups (17 people each)

   - Installation sites

   - Hofwald crossover area

   - TBM tunnelling

13.00

Change of clothes, return of materials, end of the guided tour

13.15

Lunch in the installation site's canteen

14.45

approx. Return journey to Lucerne by bus

16.00

Approximate arrival in Lucerne

 

Organisational

  • Boots, overcoats and helmets will be available.
  • The programme is subject to change depending on the site operation requirements.
  • The number of participants is limited.

 